PM MITRA Amravati (Maharashtra)
Nandagaon Peth, Amravati hosts a 1,020-acre PM MITRA Textile Park (5F vision) with ₹6,000+ Cr investment and strong connectivity.
About PM MITRA Parks
PM MITRA Textile Park, Amravati—spanning 1,020 acres at Nandagaon Peth —is a Mega Integrated Textile Park developed to bolster Maharashtra’s industrial landscape. It is designed to support end-to-end textile manufacturing with world-class infrastructure, including a planned 220 KV substation and a 10 MLD common effluent treatment plant (CETP) , while offering sustainable systems like a Solar Power Plant and 14.97 acres of plug-and-play facilities for investors.
1,020 Acres
Total land area
1 Lakh Jobs
Employment Potential
The MITRA Edge: Strategic Enablers of Amravati Park
Infrastructure & Planning
- Renewable Energy: 20 MW solar plant and shared steam facility to reduce impact.
- Circular Economy: 10 MLD CETP upgrade with Zero Liquid Discharge.
- Green Cover: land allocated for greens and green belt buffer.
- ZLD Infrastructure: Advanced CETP with ZLD compliance.
Connectivity
- Smart manufacturing: IoT-enabled, real-time monitoring, digital backbone (fiber, IT) for operational efficiency
- Digital infrastructure: Fiber backbone, SCADA/digital twins for predictive maintenance, real-time monitoring for efficient park operations.
- Advanced analytics & automation: Leveraging data insights and AI-driven decision-making for continuous improvement and optimizing energy usage.
Smart Technology
- Sustainability:20 MW solar plant to reduce environmental impact.
- Infrastructure: Advanced utility management with 10 MLD ZLD CETP, 50 mt/hr steam facility, SCADA system, and 14.97 acres of Plug & Play facilities for investors.
- Facilities & Development: Industrial sheds (800–6,000 sq.m), a 5,000 sq.m Skill Development Centre, and 13.2 acres of training and administrative infrastructure to support local skill and economic growth.
Connectivity and Logistics
- Location: Amaravati
- Total Area: 1020 Acres
- Model of Implementation: Brownfield Park implemented through State SIA i.e. MIDC
- Mumbai Nagpur Expressway 30 km
- Amravati 25 km
- Badnera 35 km
- Malegaon 43 km
- Amravati 42 km
- Nagpur 138 km
- Mumbai 710 km
- Jawaharlal Nehru Port Trust 697 km
- Mumbai Port Trust 701 km
- Tihi (Pithampur) 100 km
- Dhannad 95 km
- 14 major textile parks where 631 units are functioning in 200 km area
- Textile Commissioner of India, Mumbai
- 7 major councils/associations in Mumbai
- Bombay Textile Research Association (BTRA)
Strategic Enablers of Dhar (Madhya Pradesh)
Land & Layout
- Total Area: 1,020 acres at Nandagaon Peth, Amravati
- Manufacturing Zone: 620.43 acres, including 14.97 acres of plug-and-play plots (300–2,987 sq. m)
- Internal Roads: 5.5 km of 4-lane roads and 3.5 km of 2-lane roads
- Connectivity: Situated on NH-353K & SH-10 with a 5.3 km upgraded external road.
Power Infrastructure
- Power Augmentation: Planned 220 KV substation under Phase-II
- Immediate Power Works: HT/LT internal power network tenders invited
- Renewable Energy: 20 MW solar plant and shared steam facility to reduce impact.
Water Supply & Drainage
- Water Supply Plan: Industrial water via a dedicated external line and distribution network
- Storage Infrastructure: Ground Level Service Reservoir at WTP, Dawargaon
- Storm-Water Management: Open excavated gutters along internal roads
- Effluent Management: Collection and treated effluent recycle network.
- Circular Economy: 10 MLD CETP upgrade with Zero Liquid Discharge.
- ZLD Infrastructure: Advanced CETP with ZLD compliance.
Industrial Units & Plug-and-Play
- Plug-and-Play Units: ~14.97 acres (1.48% of land) with sheds from 800–6,000 sq.m
- Processing Utilities: Common Steam Facility for cost efficiency and centralized emission control
Green & Sustainable Infrastructure
- Sustainability Focus: Designed with sustainability as a core pillar to minimize environmental impact
- Renewable Energy: Planned 20 MW Solar Power Plant and integrated common infrastructure
- Water Management: CETP with Zero Liquid Discharge (ZLD)
- Green Cover: land allocated for greens and green belt buffer.
CIS – Competitive Incentive Support
- Land Allotment: Transparent allocation through the MILAAP portal
- Cost Competitiveness: Low-cost utilities—water at ₹15/KL and power at ₹5.5/kWh
DCS – Development Capital Support
- GoI Capital Support: ₹200 Cr Government of India share for PM MITRA Park, Amravati
- Implementation Model: Brownfield development executed by the State Authority
- Grant Status: First grant-in-aid installment of ₹30 Cr approved
- Compliance: All required documents submitted to the Ministry of Textiles
Media & News
Centre Clears Rs 1894 Cr. PM MITRA Park For Tamil Nadu
Read More →