PM MITRA Amravati (Maharashtra)

Nandagaon Peth, Amravati hosts a 1,020-acre PM MITRA Textile Park (5F vision) with ₹6,000+ Cr investment and strong connectivity.

About PM MITRA Parks

PM MITRA Textile Park, Amravati—spanning 1,020 acres at Nandagaon Peth —is a Mega Integrated Textile Park developed to bolster Maharashtra’s industrial landscape. It is designed to support end-to-end textile manufacturing with world-class infrastructure, including a planned 220 KV substation and a 10 MLD common effluent treatment plant (CETP) , while offering sustainable systems like a Solar Power Plant and 14.97 acres of plug-and-play facilities for investors.

Textile Industry
PM Event
Industry Meeting

The MITRA Edge: Strategic Enablers of Amravati Park

Metropolitan Office Tower

Infrastructure & Planning

  • Renewable Energy: 20 MW solar plant and shared steam facility to reduce impact.
  • Circular Economy: 10 MLD CETP upgrade with Zero Liquid Discharge.
  • Green Cover: land allocated for greens and green belt buffer.
  • ZLD Infrastructure: Advanced CETP with ZLD compliance.

Metropolitan Office Tower

Connectivity

  • Smart manufacturing: IoT-enabled, real-time monitoring, digital backbone (fiber, IT) for operational efficiency
  • Digital infrastructure: Fiber backbone, SCADA/digital twins for predictive maintenance, real-time monitoring for efficient park operations.
  • Advanced analytics & automation: Leveraging data insights and AI-driven decision-making for continuous improvement and optimizing energy usage.

Metropolitan Office Tower

Smart Technology

  • Sustainability:20 MW solar plant to reduce environmental impact.
  • Infrastructure: Advanced utility management with 10 MLD ZLD CETP, 50 mt/hr steam facility, SCADA system, and 14.97 acres of Plug & Play facilities for investors.
  • Facilities & Development: Industrial sheds (800–6,000 sq.m), a 5,000 sq.m Skill Development Centre, and 13.2 acres of training and administrative infrastructure to support local skill and economic growth.

Connectivity and Logistics

  • Location: Amaravati
  • Total Area: 1020 Acres
  • Model of Implementation: Brownfield Park implemented through State SIA i.e. MIDC

  • Mumbai Nagpur Expressway 30 km

  • Amravati 25 km
  • Badnera 35 km
  • Malegaon 43 km

  • Amravati 42 km
  • Nagpur 138 km
  • Mumbai 710 km

  • Jawaharlal Nehru Port Trust 697 km
  • Mumbai Port Trust 701 km

  • Tihi (Pithampur) 100 km
  • Dhannad 95 km

  • 14 major textile parks where 631 units are functioning in 200 km area

  • Textile Commissioner of India, Mumbai
  • 7 major councils/associations in Mumbai
  • Bombay Textile Research Association (BTRA)

Strategic Enablers of Dhar (Madhya Pradesh)

Land & Layout
  • Total Area: 1,020 acres at Nandagaon Peth, Amravati
  • Manufacturing Zone: 620.43 acres, including 14.97 acres of plug-and-play plots (300–2,987 sq. m)
  • Internal Roads: 5.5 km of 4-lane roads and 3.5 km of 2-lane roads
  • Connectivity: Situated on NH-353K & SH-10 with a 5.3 km upgraded external road.
Power Infrastructure
  • Power Augmentation: Planned 220 KV substation under Phase-II
  • Immediate Power Works: HT/LT internal power network tenders invited
  • Renewable Energy: 20 MW solar plant and shared steam facility to reduce impact.
Water Supply & Drainage
  • Water Supply Plan: Industrial water via a dedicated external line and distribution network
  • Storage Infrastructure: Ground Level Service Reservoir at WTP, Dawargaon
  • Storm-Water Management: Open excavated gutters along internal roads
  • Effluent Management: Collection and treated effluent recycle network.
  • Circular Economy: 10 MLD CETP upgrade with Zero Liquid Discharge.
  • ZLD Infrastructure: Advanced CETP with ZLD compliance.
Industrial Units & Plug-and-Play
  • Plug-and-Play Units: ~14.97 acres (1.48% of land) with sheds from 800–6,000 sq.m
  • Processing Utilities: Common Steam Facility for cost efficiency and centralized emission control
Green & Sustainable Infrastructure
  • Sustainability Focus: Designed with sustainability as a core pillar to minimize environmental impact
  • Renewable Energy: Planned 20 MW Solar Power Plant and integrated common infrastructure
  • Water Management: CETP with Zero Liquid Discharge (ZLD) 
  • Green Cover: land allocated for greens and green belt buffer.
M.P. Layout
CIS – Competitive Incentive Support
  • Land Allotment: Transparent allocation through the MILAAP portal
  • Cost Competitiveness: Low-cost utilities—water at ₹15/KL and power at ₹5.5/kWh
     
DCS – Development Capital Support
  • GoI Capital Support: ₹200 Cr Government of India share for PM MITRA Park, Amravati
  • Implementation Model: Brownfield development executed by the State Authority
  • Grant Status: First grant-in-aid installment of ₹30 Cr approved
  • Compliance: All required documents submitted to the Ministry of Textiles

Media & News

Centre Clears Rs 1894 Cr. PM MITRA Park For Tamil Nadu

Read More →

PM MITRA textile park in Virudhunagar to boost TN’s textile capability

Read More →

Investor Connect