PM MITRA Virudhunagar (Tamil Nadu)

Virudhunagar, TN hosts a 1,052-acre PM MITRA Park with cotton supply, strong industry, and excellent connectivity.

About PM MITRA Parks

PM MITRA Park, Tamil Nadu—spanning 1052 acres across E. Kumaralingapuram, E. Muthulingapuram, and Thulukkupatti villages—is a greenfield state-of-the-art Integrated Mega Textile Park developed to bolster the state's industrial landscape. It is designed to support end-to-end textile manufacturing with world-class infrastructure, including a dedicated 110/33/11 KV substation and a 15 MLD common effluent treatment plant, while offering sustainable systems and approximately 13 lakh sq. ft. of plug-and-play units for investors.

Textile Industry
PM Event
Industry Meeting

The MITRA Edge: Strategic Enablers of Virudhunagar Park

Metropolitan Office Tower

Infrastructure & Planning

  • Renewable Energy: 20 MW solar plant planned
  • Sustainability: Greenfield integrated mega textile park
  • Green Cover: 15.69% land (159.90 acres) as open space
  • ZLD & CETP: 15 MLD effluent treatment facility

Metropolitan Office Tower

Connectivity

  • Smart manufacturing: IoT-enabled, real-time monitoring, digital backbone (fiber, IT) for operational efficiency
  • Digital infrastructure: Fiber backbone, SCADA/digital twins for predictive maintenance, real-time monitoring for efficient park operations.
  • Advanced analytics & automation: Leveraging data insights and AI-driven decision-making for continuous improvement and optimizing energy usage.

Metropolitan Office Tower

Smart Technology

  • Integrated Mega Textile Park: State-of-the-art park in Tamil Nadu with focus on sustainability and efficiency
  • Utility Infrastructure: CETP and Steam House Plant for centralized operations
  • Plug & Play Units: ~13 lakh sq. ft. ready-to-use space for investors
  • Testing & Training: Dedicated facilities with Skill Development / ITI area
  • Logistics: Dedicated area allocated for logistics infrastructure
  • Workers’ Housing: Accommodation for more than 10,000 workers

Connectivity and Logistics

  • Location: Virudhunagar
  • Total Area: 1,052 Acres
  • Model of Implementation: SPV led model, Implemented by SIPCOT

  • Madurai-KanyaKumari (NH 44) 2 km

  • Tulakapatti 4 km
  • Sattur 11 km
  • Virudhunagar 22 km

  • Madurai International Airport 50 km

  • Tuticorin (V.O. Chidambaranar Port)

  • ICD at Madurai 60 km

  • Virudhunagar 15 km
  • Tiruppur 210 km
  • Erode 230 km
  • Madurai 50 km
  • Coimbatore 250 km
  • Salem 270 km

  • Sardar Vallabhbhai Patel International School of Textiles & Management, Coimbatore
  • South India Textile Research Institution (SITRA), Coimbatore

Strategic Enablers of Dhar (Madhya Pradesh)

Land & Layout
  • Total Area: 1,052 acres (E. Kumaralingapuram, E. Muthulingapuram, Thulukkupatti)
  • Industrial Area: 566.33 acres + ~13 lakh sq. ft. plug-and-play units
  • Internal Infrastructure: Roads, stormwater drainage, street lighting
  • Connectivity: Four-lane road from NH-44 to E. Kumaralingapuram
Power Infrastructure
  • Substation: 110/33/11 KV at Virudhunagar (from Anupankulam EB)
  • Cost: ~INR 150 Cr for substation & power network
  • Renewable Energy: 20 MW solar plant planned
  • Master Plan: Substation land earmarked within 1,052-acre site
Water Supply & Drainage
  • Internal Network: Sump works and 250 mm DI pipeline ongoing
  • Drainage & Trunk Infra: Storm drains, cross-drainage, power ducts
  • Effluent Treatment: 15 MLD CETP + 5 MLD STP
  • Utilities & Energy: Steam House Plant + 20 MW solar plant
Industrial Units & Plug-and-Play
  • Plug-and-Play: ~13 lakh sq. ft. ready units
  • Central Utilities: Steam House Plant
  • Trunk Infrastructure: Water, power ducts, storm drains
  • Environmental Systems: 15 MLD CETP + 5 MLD STP
Green & Sustainable Infrastructure
  • Resource Efficiency: Rainwater harvesting & landscaping
  • Green Cover: 159.90 acres (15.69%) open space
  • Clean Utilities: Steam House + 20 MW solar plant
  • Water Treatment: 15 MLD CETP + 5 MLD STP
  • Sustainable Assets: ~13 lakh sq. ft. plug-and-play units & workers’ housing
  • Sustainability: Greenfield integrated mega textile park
M.P. Layout
CIS – Competitive Incentive Support
  • Jobs: 100,000+ target
  • Incentives: Technical textiles, apparel, knitwear, processing
  • Blueprint: Integrated park with ~13 lakh sq. ft. plug-and-play units
DCS – Development Capital Support
  • SPV & Cost: Implemented via SPV
  • Funding: INR 50 Cr first installment (11.11.2025)
  • Core Infra: 110/33/11 KV substation CETP
  • Trunk Infra: Roads, water supply, sewerage

Media & News

Work of mega textile project in Kalaburagi delayed

Read More →

Karnataka Minister promises early execution of PM MITRA Textile Park in Kalaburagi

Read More →

Investor Connect