Gujarat Banner.Jpg

PM MITRA Gujarat,Navsari

Navsari, GJ hosts a 1,142-acre PM MITRA Park with cotton supply, strong industry, and excellent connectivity.

icon
Connectivity
icon
Site Progress
icon
Navsari Edge
icon
Facilities
icon
Conducive Policy
icon
Layout
icon
Downloads
icon
Meet Us At
icon
Connect With Us

About PM MITRA Navsari

icon Salient features
  • Land area: 1142 acres (~4.62 sq. km)
  • Project cost: INR 2,398 Cr (~USD 289 million)
  • Implementation model: Greenfield PPP
icon Offerings
  • Industrial plots: 534.77 acres
  • Green Spaces: 165.06 acres
  • Plug-and-Play Units
  • Water Supply and Drainage
  • Power Infrastructure
  • Solar Power Plant
icon Projected Outcomes
  • Direct jobs: 1,00,000
  • Investment: INR 13,084 Cr 
icon Competitive costs
  • Power: Rs 6.24 / unit
  • Water: Rs 37.96 / KL
icon Features
• Plug and Play Units • ZLD CETP • Common Facility Center
• Single Window Clearance • Encumbrance Free Land • Skill Development Center

Connectivity

Highway

28 km

National
Highway 48

Railway

35 km

Navsari Railway Station

Airport

55 km

Surat International
Airport

Port

65 km

Hazira
Port

Logistics

40km

ICD
Surat–Sachin

Infrastructure Status Overview

Land and site development

Internal core infrastructure works commenced; internal roads of ~5.7 km

Work Commenced
Access roads

Internal roads of ~ 5.5 Km

45% Completed
Water Supply (external)

Water Supply Scheme from source to park – work commenced

46% Complete
Water Supply (internal)

Water available for construction activities

Completed
Power

~65 MVA power available through GETCO substations

Completed

The PM MITRA Navsari Edge

icon
Land

Fully planned trunk infrastructure including roads, drainage, power, water, and common amenities.

icon
EoDB

EC and DTCP approvals in place

icon

Design and innovation acumen

• Man-made Textile Research Association
• National Institute of Fashion Technology
• On site infrastructure supporting training, technology upgradation, research, and industry collaboration
icon
Entrepreneurial ecosystem

Textile Clusters
Surat (46 km), Ahmedabad (301 km), Rajkot (525 km)
Powerloom Clusters
Bhuj / Kutch (630 km)

Facilities

  • Fire Services Building with firefighting equipment, control room, emergency response units and first aid facilities

  • Integrated Command and Control Centre (ICCC) for park-wide monitoring and operations

  • Internal Spine Roads

  • Power Supply Infrastructure with substations and feeder connectivity

  • Water Supply & Sewerage Systems

  • Logistics Park & Warehousing Facilities for storage of raw materials and finished goods, with truck parking and servicing amenities

  • Plug-and-Play Facilities enabling immediate operational readiness through ready-built factory units

  • Common Effluent Treatment Plant (CETP) with Zero Liquid Discharge (ZLD) (Phase-wise development starting with 12.5 MLD)

  • Sewerage Collection and Treatment System using MBBR-based biological treatment

  • Administrative Building, Centre of Excellence & R&D Facility for park management, innovation and technology support

  • Commercial & Office Complex including banking, post office, canteen and allied services

  • Convention & Exhibition Hall for sectoral exhibitions and events

  • Training Centre / ITI & Skill Development Facilities

  • Hotel Complex and Food Court catering to visitors and park workforce

  •  
  • Residential Buildings for park employees
  • Women’s Hostel / Worker Housing
  • Health Facilities including a primary health centre
  • Education Facilities from nursery to senior secondary level
  •  

Conducive Policy

  • Garments: 35% of eFCI, up to ₹100 Cr

  • Garments (enhanced): 35% of eFCI, up to ₹150 Cr

  • Other Textile Activities

    • Subsidy: 20% of eFCI, up to ₹50 Cr

    • Subsidy (enhanced): 25% of eFCI, up to ₹150 Cr

  • MSMEs: 15% subsidy up to ₹30 lakh on eligible Plant & Machinery

  • Garments

    • Interest subsidy: @7% on term loan for 8 years

    • Ceiling: 3% of eFCI per annum

  • Other Textile Activities

    • Interest subsidy: @7% on term loan for 7 years (ceiling: 2% of eFCI per annum)

    • Interest subsidy (enhanced): @7% on term loan for 8 years (ceiling: 3% of eFCI per annum)

  • Garments

    • Female workers: ₹5,000/month per worker

    • Male workers: ₹4,000/month per worker

    • Support period: For 5 years and 10 years (as applicable)

  • Other Textile Activities / Labour Intensive Units

    • Female workers: ₹3,000/month per worker

    • Male workers: ₹2,000/month per worker

    • Support period: For 5 years and 10 years (as applicable)

Layout

Downloads

Brochure
Download
Land Allotment Policy
Download
Industrial Development Policy
Download
State Textile Policy
Download
State MSME Policy
Download

Meet Us At

icon
Investor Summit

India is a country full of diversities. The world is observing India's diversity with amazement, and as a result, the attraction towards India has also increased.

icon
Invest India

3rd most attractive state for FDI inflows with a total inflow of $46.11 Bn from October 2019 to June 2025.

icon
Road Show

For any queries connect with us

GOVT. OF GUJARAT
Ms. Mamta Verma, IAS – Principal Secretary
Industries & Mines Department
Phone
Email
secimd@gujarat.gov.in

Ms. Praveena D.K., IAS – VC & MD (GIDC)
Industries & Mines Department
Phone
Email
vcmd@gidcgujarat.org

Feedback & Suggestion

Submit your enquiry and our team will get back to you shortly.